What will I need?

  • A relatively smooth and even surface
    with no sharp objects. The bench or ground can be sloping but must be
    even.

  • A piece of Ebb & Flow Mat of the
    desired width, cut to length.

  • One header pack per mat.

  • One filter/pressure reducer/pressure
    gauge unit. Click here for photo

  • An electronic irrigation timer and
    solenoid/s.

  • A water supply. (12 psi is the
    required pressure, and a flow rate of 30L/min per 100LM (7USg/Min).
    Anything below this can result in poor performance. (Note: If the water is
    too dirty, you will have to clean your filter more often to ensure proper
    performance.)